CarFreight Review, independent auto transport research
HOME/GUIDES/BOAT & YACHT
OVERSIZE & YARD · READ NOV 2026
FIELD GUIDE // WATERCRAFT

BIG WATER,
BIGGER RIG.

Boats and yachts are measured, permitted and loaded differently from cars. Mirrors folded or removed, height for overpasses, width for state roads, and who is responsible for the cradle that holds the hull on the deck are the questions that decide the move before anyone signs. Here is the order to plan.

Trailered vs Yard: Two Different Bookings

  1. 01Trailered, your trailer: carrier drives it as tow load; weight and height must stay within legal limits; mirrors and antenna removed; propane drained.
  2. 02Trailered, carrier's cradle: you supply hull and dimensions; carrier supplies cradle, winch, straps, and route survey; oversize permitting is the carrier's job, priced in.
  3. 03Yard-to-yard freight: yacht is loaded inside the yard for ocean or rail leg; you arrange truck at each end; paperwork includes dockside surveyor signatures.
  4. 04Custom cradle: for anything over 40 feet or over ~12 feet height, the cradle is the transport; bring the hull ID and lifting points before any quote makes sense.

The Measurement That Decides The Move

  • ·Height from ground to top of arch (radar, antenna, bimini, masts, arch): under 11-12 feet for most routes; anything higher needs oversize permits and route survey.
  • ·Beam (width): over 8 feet 6 inches is oversize in most states; escort vehicles and signage mandatory over certain thresholds.
  • ·Overall length including motor and swim platform: determines deck class and whether it fits on a step-deck.
  • ·Weight including fuel, water, batteries, and gear: every deck class has a ceiling; exceeding it without permits is a citation, not a curiosity.

The Yard Reality Check

A yard will not release a boat onto an unknown carrier without papers, and a carrier will not load without a cradle built to spec. Book the truck before you book the yard appointment; the yard is the bottleneck and it does not get faster because the broker is impatient.

Every yacht moves on a cradle the carrier builds or you supply. If the cradle is not right, the hull is not safe. Ask who signs for the cradle, in writing, before payment.